SAP ABAP Data Element ISH_COPAY_PROC_CHDAT (Changeover Date of Copayment Procedure)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
NBAS (Package) Appl. development Hospital System master data, catalogs
⤷
⤷
⤷
Basic Data
| Data Element | ISH_COPAY_PROC_CHDAT |
| Short Description | Changeover Date of Copayment Procedure |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | TPK_DATUM | |
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | CHANGE_UP_TO_DATE | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Chg. Date |
| Medium | 14 | Changeov. Date |
| Long | 25 | Changeover Date |
| Heading | 10 | Chg. Date |
Documentation
Definition
This field contains the date on which copayment processing was switched to a different procedure.
The field is changed by the changeover program RNU_COP_PROC_CHANGE. You should not make an entry in this field.
Use
Copayment is processed in IS-H according to two different procedures, namely the receivable procedure and the collection procedure.
History
| Last changed by/on | SAP | 20110809 |
| SAP Release Created in |