SAP ABAP Data Element ISH_COPAY_PROC_CHDAT (Changeover Date of Copayment Procedure)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       NBAS (Package) Appl. development Hospital System master data, catalogs
Basic Data
Data Element ISH_COPAY_PROC_CHDAT
Short Description Changeover Date of Copayment Procedure  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type TPK_DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name CHANGE_UP_TO_DATE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Chg. Date 
Medium 14 Changeov. Date 
Long 25 Changeover Date 
Heading 10 Chg. Date 
Documentation

Definition

This field contains the date on which copayment processing was switched to a different procedure.

The field is changed by the changeover program RNU_COP_PROC_CHANGE. You should not make an entry in this field.

Use

Copayment is processed in IS-H according to two different procedures, namely the receivable procedure and the collection procedure.

History
Last changed by/on SAP  20110809 
SAP Release Created in