SAP ABAP Data Element HB_PRELIM (Preliminary / Full scheduling)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
LO (Application Component) Logistics - General
⤷
DI_HBS (Package) Real Estate Sales and Configuration Mngmt. (Home Building)
⤷
⤷
Basic Data
| Data Element | HB_PRELIM |
| Short Description | Preliminary / Full scheduling |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CHAR1 | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Pre/Full |
| Medium | 19 | Prelim./Full Sched. |
| Long | 29 | Preliminary / Full Scheduling |
| Heading | 29 | Preliminary / Full Scheduling |
Documentation
Definition
Specifies what type of scheduling to run. If you select preliminary scheduling, the system creates a preliminary updated schedule for operations only. The associated material requirements are not updated. To ensure that data remain fully consistent, you must always follow a preliminary scheduling run with a full scheduling run.
If you select full scheduling, the system performs the normal scheduling run.
History
| Last changed by/on | SAP | 20050301 |
| SAP Release Created in | 46C2 |