SAP ABAP Data Element HB_NEXT_DAY (Date for preliminary scheduling to start)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ LO (Application Component) Logistics - General
⤷ DI_HBS (Package) Real Estate Sales and Configuration Mngmt. (Home Building)
⤷ LO (Application Component) Logistics - General
⤷ DI_HBS (Package) Real Estate Sales and Configuration Mngmt. (Home Building)
Basic Data
Data Element | HB_NEXT_DAY |
Short Description | Date for preliminary scheduling to start |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATS | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 12 | Sched. dat |
Medium | 25 | Schedule date to use |
Long | 40 | Date for preliminary scheduling to start |
Heading | 40 | Date for preliminary scheduling to start |
Documentation
Definition
With this field, it is possible to select an arbitrary date in the future to use as the starting point of the scheduling run, so all activities will be scheduled with that date instead of today's date.
This only works if the preliminary scheduling flag is active. Full scheduling must still take place on the date you wish to start scheduling.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in | 46C2 |