SAP ABAP Data Element HB_NEXT_DAY (Date for preliminary scheduling to start)
Hierarchy
ECC-DIMP (Software Component) DIMP
   LO (Application Component) Logistics - General
     DI_HBS (Package) Real Estate Sales and Configuration Mngmt. (Home Building)
Basic Data
Data Element HB_NEXT_DAY
Short Description Date for preliminary scheduling to start  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATS    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 12 Sched. dat 
Medium 25 Schedule date to use 
Long 40 Date for preliminary scheduling to start 
Heading 40 Date for preliminary scheduling to start 
Documentation

Definition

With this field, it is possible to select an arbitrary date in the future to use as the starting point of the scheduling run, so all activities will be scheduled with that date instead of today's date.

This only works if the preliminary scheduling flag is active. Full scheduling must still take place on the date you wish to start scheduling.

History
Last changed by/on SAP  20110901 
SAP Release Created in 46C2