SAP ABAP Data Element GM_PBC_ACTIVE (GM-PBC Integration Indicator)
Hierarchy
EA-PS (Software Component) SAP Enterprise Extension Public Services
   PSM-GM-GTE (Application Component) Grantee Management
     GMBASIS_E (Package) Grants management (basis)
Basic Data
Data Element GM_PBC_ACTIVE
Short Description GM-PBC Integration Indicator  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PBC_ACTIVE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PBC Active 
Medium 15 PBC Integration 
Long 25 PBC Integration Indicator 
Heading 25 PBC Integration Indicator 
Documentation

Definition

This indicator turns on, at company code level, the integration between Grants Management (GM) and Position and Budget Control (PBC).

As a result, the beginning date for a budget validity period of a given grant has to coincide with the first day of the organization's fiscal period.

History
Last changed by/on SAP  20030326 
SAP Release Created in 200