SAP ABAP Data Element GM_PBC_ACTIVE (GM-PBC Integration Indicator)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷
PSM-GM-GTE (Application Component) Grantee Management
⤷
GMBASIS_E (Package) Grants management (basis)
⤷
⤷
Basic Data
| Data Element | GM_PBC_ACTIVE |
| Short Description | GM-PBC Integration Indicator |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | PBC_ACTIVE | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PBC Active |
| Medium | 15 | PBC Integration |
| Long | 25 | PBC Integration Indicator |
| Heading | 25 | PBC Integration Indicator |
Documentation
Definition
This indicator turns on, at company code level, the integration between Grants Management (GM) and Position and Budget Control (PBC).
As a result, the beginning date for a budget validity period of a given grant has to coincide with the first day of the organization's fiscal period.
History
| Last changed by/on | SAP | 20030326 |
| SAP Release Created in | 200 |