Hierarchy
⤷ CA-GTF-TS (Application Component) Technical Application Support
⤷ BM (Package) MM Cross-Application Objects
Basic Data
Data Element | FRGDT |
Short Description | Purchase Requisition Release Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | REL_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Release Dt |
Medium | 15 | Release Date |
Long | 20 | Release Date |
Heading | 10 | Release Dt |
Documentation
Definition
Specifies the date on which the purchase order should be initiated on the basis of the purchase requisition.
The release date is based on:
- The purchasing department processing time defined for the plant
- The planned delivery time from the material master record or purchasing info record
- The delivery date
- The goods receipt processing time from the material master record
Note
The planned delivery time from the purchasing info record and the GR processing time are only taken into account if the purchase requisition was generated via materials planning.
Example
Processing time Planned del. GR processing
Purchasing time time
|----------|---------------------|--------|
Release PO Delivery Date
date date date required
Date required: 01.10.2007
GR processing time: 2 days (working days)
Planned delivery time: 10 days (calendar days)
Purchasing dept processing time: 2 days (working days)
For the material to be available on the date it is needed, the purchase requisition must be released on 13.09.2007 (requirement date less GR processing time, planned delivery time, and purchasing department processing time).
Supplementary Documentation - FRGDT 0001
Procedure
The release date is proposed automatically by the system. You can change the date.
History
Last changed by/on | SAP | 19990224 |
SAP Release Created in |