SAP ABAP Data Element FRE_PO_NOT_REL_REC_LOC (Transmission of POs for F&R-Relevant Supplying Plants)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   CA (Application Component) Cross-Application Components
     WFRE_PI (Package) Connectivity with F&R
Basic Data
Data Element FRE_PO_NOT_REL_REC_LOC
Short Description Transmission of POs for F&R-Relevant Supplying Plants  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FRE_PO_NOT_REL_REC_LOC    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PO F&R Rel 
Medium 20 PO F&R-Relv. 
Long 40 Transm. of POs for F&R-Relv. Suppl.Plnts 
Heading 40 Transm. of POs for F&R-Relv. Suppl.Plnts 
Documentation

Definition

Use

By default, SAP F&R order proposal items are only considered for the requirements calculation of the receiving plant. However, in a multilevel replenishment scenario, SAP Forecasting and Replenishment (SAP F&R) also needs to consider order proposal items for the requirements calculation of the supplying plant. You use this field to specify which purchase order (PO) items in SAP ERP are transferred to SAP F&R in cases where the combination of material and supplying plant is SAP F&R relevant but not the combination of material and receiving plant.

You can specify the transfer of PO items in SAP ERP to SAP F&R as follows:

  • The system transfers only PO items in which the combination of material and receiving plant is relevant for replenishment in SAP F&R. This is the default setting.
  • In addition to PO items in which the combination of material and receiving plant is SAP F&R relevant, the system also transfers all PO items in which the combination of material and supplying plant is relevant for replenishment in SAP F&R but not the combination of material and receiving plant.
  • In addition to PO items in which the combination of material and receiving plant is SAP F&R relevant, the system transfers PO items in which the combination of material and supplying plant is relevant for replenishment in SAP F&R but not the combination of material and receiving plant. However, these additional PO items are transferred only if the planned goods issue date has been reached or is in the past, but the goods issue is not (yet completely) posted. They are then considered in the SAP F&R requirements calculation within the backorder horizon.

Dependencies

Example

History
Last changed by/on SAP  20130529 
SAP Release Created in 606