Hierarchy
⤷ CA (Application Component) Cross-Application Components
⤷ WFRE_PI (Package) Connectivity with F&R
Basic Data
Data Element | FRE_LFRHY |
Short Description | Planning cycle |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MRPPP | |
Data Type | CHAR | Character String |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table | T439G |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan Cycle |
Medium | 15 | Planning Cycle |
Long | 20 | Planning Cycle |
Heading | 3 | PCy |
Documentation
Definition
Key that determines the day on which the material is planned and ordered. The planning cycle is a planning calendar that is defined in Customizing for MRP.
Use
In addition to the planning cycle, you can enter a delivery cycle that is defined in the planning calendar field.
Dependencies
Example
It makes sense to enter a delivery cycle for the following situation:
You carry out the planning run and place orders every Monday and Tuesday. Materials that are ordered on Monday are delivered on Wednesday, while materials that are ordered on Tuesday are not delivered until Friday.
The system interprets an additionally specified planned delivery time as the minimum delivery time, which means that at least this number of days pass between the planning run or the order and delivery.
History
Last changed by/on | SAP | 20110901 |
SAP Release Created in | 605 |