Hierarchy
⤷ CA (Application Component) Cross-Application Components
⤷ WFRE_PI (Package) Connectivity with F&R
Basic Data
Data Element | FRE_DIF_SDATE |
Short Description | Start of Consideration Period for Number of Supplied Plants |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | SDATE | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table | T811C |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Valid From |
Medium | 15 | Valid From |
Long | 30 | Start Date |
Heading | 20 | Start Date |
Documentation
Definition
This data defines the start of the consideration period for the calculation of the number of plants supplied with an article from a distribution center.
Use
The calculation of the number of plants does not start until this date.
Dependencies
The date is defaulted when you start the program.
The date results from the current date, less the relevant period.
The system copies the relevant period from the settings in Customizing for the screen area BEF Parameters for the Number of Supplied Plants.
Define the relevant period in Customizing under Integration with Other SAP Components -> Forecasting and Replenishment -> Maintain Basic Settings for Data Transfer.
If you change the period in Customizing, you need to carry out a new initial data upload (with the number of plants supplied by a distribution center).
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |