Hierarchy
⤷ CA (Application Component) Cross-Application Components
⤷ WFRE_PI (Package) Connectivity with F&R
Basic Data
Data Element | FRE_DIF_PAST_PERIOD2 |
Short Description | Period in Weeks for Number of Supplied Plants |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FRE_DIF_PAST_PERIOD | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Period |
Medium | 15 | Relevant Period |
Long | 25 | Relevant Period |
Heading | 20 | Relevant Period |
Documentation
Definition
Specifies the number of weeks in the past in which you wish to calculate the BEF occurrences of combinations of article and plant in the supplied plants and transfer them to SAP F&R..
Use
The default value for the start of the consideration period results from the current date, less this period.
Start of the consideration period for the
- Initial data upload
You can change the default value in the selection options.
- Delta upload
You cannot change the default value.
- Reorganization
You cannot change the default value.
Dependencies
You change the relevant period (in weeks) in Customizing under Integration with Other SAP Components -> Forecasting and Replenishment -> Maintain Basic Settings for Data Transfer in the screen area BEF Parameters for Number of Supplied Plants.
If you change the period in Customizing, you need to carry out a new initial data upload (with the number of plants supplied by a distribution center).
Example
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 700 |