SAP ABAP Data Element FRE_CHK_CHANGE_POINTER_PERIOD (Change Pointer Period)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
CA (Application Component) Cross-Application Components
⤷
WFRE_PI (Package) Connectivity with F&R
⤷
⤷
Basic Data
| Data Element | FRE_CHK_CHANGE_POINTER_PERIOD |
| Short Description | Change Pointer Period |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | NUMC3 | |
| Data Type | NUMC | Character string with only digits |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 3 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | CP Period |
| Medium | 15 | CP Period |
| Long | 20 | Change Point. Period |
| Heading | 15 | CP Period |
Documentation
Definition
Specifies the number of hours the program should go back in time in order to evaluate whether a change pointer exists for the master data object in question.
Use
If the Consider Change Pointers indicator is set, you must enter a value in this field.
Dependencies
If the system determines that a master data object is inconsistent and identifies a change pointer for this object, the object will either not appear in the list of inconsistencies, or it will appear marked with a special icon (see the Issue inconsistencies with change pointer/interface entry indicator). This is because the system assumes that the inconsistency will be eliminated when the change pointer is processed.
Example
History
| Last changed by/on | SAP | 20110901 |
| SAP Release Created in | 605 |