SAP ABAP Data Element FM_CHECK_MODE (Check Mode in FM for CO planning)
Hierarchy
☛
EA-PS (Software Component) SAP Enterprise Extension Public Services
⤷
PSM-FM (Application Component) Funds Management
⤷
FMFS_E (Package) Updating/Integration Funds Management (master lang. english)

⤷

⤷

Basic Data
Data Element | FM_CHECK_MODE |
Short Description | Check Mode in FM for CO planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FM_CHECK_MODE | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Check Mode |
Medium | 15 | Plan Check Mode |
Long | 20 | Planning Check Mode |
Heading | 19 | Planning Check Mode |
Documentation
Definition
Defines the scope for which Controlling (CO) planning transactions are checked for compliance with Funds Management (FM).
Use
The derivation of the FM account assignments are carried out by periods because the result of the FM derivation strategies can vary from period to period. Set this indicator if, for performance reasons, you just wish to check compliance with one period (the first one) or not at all. SAP recommends that you always check the entire planning horizon.
Dependencies
The transfer of planned values in CO to FM is always checked in full.
Example
History
Last changed by/on | SAP | 20040315 |
SAP Release Created in | 500 |