SAP ABAP Data Element FANACHF (JIT Delivery Schedule: Follow-Up Material)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   LO (Application Component) Logistics - General
     DIMP_STD (Package) Standard Objects of DIMP Industries
Basic Data
Data Element FANACHF
Short Description JIT Delivery Schedule: Follow-Up Material  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Foll-UpMat 
Medium 17 Follow-Up Matl 
Long 20 Follow-Up Material 
Heading 17 Follow-Up Matl 
Documentation

Definition

Determines whether a JIT delivery schedule is stopped for the purposes of message output if a follow-on material becomes relevant within the release horizon.

Use

If you select this indicator, JIT schedules will be generated by the SA release creation program, but held back from the messge output process.

Note
The stopping of SA releases is only possible in the case of scheduling agreements with release documentation if a separate message is generated for each SA release (Rel.Mess. indicator in Customizing for Message Control ) and if SA releases are generated using the release creation program (transaction ME84/program RM06EFLB).
SA releases generated manually during delivery schedule maintenance are not stopped.

Dependencies

Stopped SA releases must be released in a separate step (Purchasing -> Outline Agreement -> Scheduling Agreement -> Delivery Schedule -> Release Stopped SA Releases).
A message record is not generated until you release (approve, clear for issue) a stopped SA release.

Note
If releases have been created and stopped with the release creation report, the MRP controller responsible can be informed about this with the Workflow.

More information is available in the SAP Library under SAP Automotive -> MM Scheduling Agreements Enhancements -> SA Releases: Process -> Workflows for the MRP Controllers.

History
Last changed by/on SAP  20041209 
SAP Release Created in 46C