SAP ABAP Data Element FAGL_DUEGRID_DATE (Date Limit of Grid Group)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ FI-GL (Application Component) General Ledger Accounting
⤷ FAGL_CLOSING_ACTIVITIES (Package) Closing Activities in FI
⤷ FI-GL (Application Component) General Ledger Accounting
⤷ FAGL_CLOSING_ACTIVITIES (Package) Closing Activities in FI
Basic Data
Data Element | FAGL_DUEGRID_DATE |
Short Description | Date Limit of Grid Group |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Date Limit |
Medium | 20 | DateLimit of GridGrp |
Long | 40 | Date Limit of Grid Group |
Heading | 55 | Date Limit of Grid Group |
Documentation
Definition
Specifies the start date of the remaining term interval for a grid group.
Use
As part of the foreign currency valuation of open items, time-dependent attributes for a specific remaining term interval can be assigned to the valuation method used. Starting with the key date of the item selection, the system determines the start datef for the remaining term interval. Items with a due date for net payment after this date are assigned to the specified grid group.
Dependencies
Example
Initial Data
- Key date of item selection: 2010-01-31
- Remaining term interval: 5 months
Result
The start date of the remaining term interval is 2010-07-01. Items with a due date for net payment after 2010-07-01 are assigned to the specified grid group.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 605 |