SAP ABAP Data Element EVMET_PLN2ACT (Indicator: Use method for planned POC as default for act.POC)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CNEV (Package) R/3 application development PS earned value analysis
Basic Data
Data Element EVMET_PLN2ACT
Short Description Indicator: Use method for planned POC as default for act.POC  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ref. plan 
Medium 15 Ref. plan meth. 
Long 20 Refer plan method 
Heading  
Documentation

Definition

Stipulates that, if you do not specify an actual measurement method for progress determination, the system uses an existing method for the relevant object.

The system adopts the measurement method according to the following priorities:

  • Planned POC for the object
  • Measurement method default value in the plan for the object type
  • Measurement method default value for actual values for the object type
  • Standard POC SAP 0-100

You define the default values per object type in the Project System IMG. If you do not define any default values, the system uses the standard measurement method SAP 0-100.

History
Last changed by/on SAP  19980423 
SAP Release Created in