SAP ABAP Data Element EVMET_ACT2PLN (Use the actual POC method as the planned POC method)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CNEV (Package) R/3 application development PS earned value analysis
⤷
⤷
⤷
Basic Data
| Data Element | EVMET_ACT2PLN |
| Short Description | Use the actual POC method as the planned POC method |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFIELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Act. meth. |
| Medium | 15 | Actual method |
| Long | 20 | Actual method |
| Heading | 0 |
Documentation
Definition
Stipulates that, if you do not specify a planned measurement method for determining the percentage of completion, the system uses an existing method.
The system adopts the measurement method according to the following priorities:
- Actual POC for the object
- Measurement method default value in the plan for the object type
- Measurement method default value for actual values for the object type
- Standard POC SAP 0-100
You define the default values per object type in the Project System IMG. If you do not define any default values, the system uses the standard measurement method SAP 0-100.
History
| Last changed by/on | SAP | 19990421 |
| SAP Release Created in |