SAP ABAP Data Element EVMET_ACT2PLN (Use the actual POC method as the planned POC method)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CNEV (Package) R/3 application development PS earned value analysis
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CNEV (Package) R/3 application development PS earned value analysis
Basic Data
Data Element | EVMET_ACT2PLN |
Short Description | Use the actual POC method as the planned POC method |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFIELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Act. meth. |
Medium | 15 | Actual method |
Long | 20 | Actual method |
Heading | 0 |
Documentation
Definition
Stipulates that, if you do not specify a planned measurement method for determining the percentage of completion, the system uses an existing method.
The system adopts the measurement method according to the following priorities:
- Actual POC for the object
- Measurement method default value in the plan for the object type
- Measurement method default value for actual values for the object type
- Standard POC SAP 0-100
You define the default values per object type in the Project System IMG. If you do not define any default values, the system uses the standard measurement method SAP 0-100.
History
Last changed by/on | SAP | 19990421 |
SAP Release Created in |