SAP ABAP Data Element EV_METHOD_DEF_PLN (Default value for planned measurement method)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CNEV (Package) R/3 application development PS earned value analysis

⤷

⤷

⤷

Basic Data
Data Element | EV_METHOD_DEF_PLN |
Short Description | Default value for planned measurement method |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR10 | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Pln deflt |
Medium | 15 | Pld msmt mt.dft |
Long | 20 | Pld msmt meth.dflt |
Heading | 10 | Pln deflt |
Documentation
Definition
Key which identifies the
measurement method used to calculate the percentage of completion POC) if you have not expressly entered one.
You store the default values per object category in Customizing.
If the default value "SAP 0-100" appears, no default value has been stored in Customizing for this object category and you are working with a 0-100 technique, including an 80% maximum POC without an actual finish date.
History
Last changed by/on | SAP | 19980525 |
SAP Release Created in |