SAP ABAP Data Element ERHOR (Opening period)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD01 (Package) Appl. dev. R/3 consumption driven gen. requirements planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MD01 (Package) Appl. dev. R/3 consumption driven gen. requirements planning
Basic Data
Data Element | ERHOR |
Short Description | Opening period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | ERHOR | |
Data Type | NUMC | Character string with only digits |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | OpngPeriod |
Medium | 15 | Opening period |
Long | 20 | Opening period |
Heading | 5 | Op.Pd |
Documentation
Definition
Number of workdays subtracted from the order start date to determine the creation date.
Use
The opening period can be used by the MRP controller as an extra time buffer.
The opening period is only used in backward scheduling.
History
Last changed by/on | SAP | 19930713 |
SAP Release Created in |