Hierarchy
⤷ IS-U-MD (Application Component) Master Data
⤷ EE01 (Package) IS-U Master Data
Basic Data
Data Element | E_MOVE_OUT_LATEST |
Short Description | Offset for latest start date before move-out date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | E_STICHTAG | |
Data Type | NUMC | Character string with only digits |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | LatestStrt |
Medium | 15 | Latest start |
Long | 20 | Latest start |
Heading | 10 | LatestStrt |
Documentation
Definition
You can set the workflow start date for automatic owner move-out in Customizing via this offset. The date is determined by subtracting the offset from the end of the validity period. If the date is before the current date, then the current date is used.
The offset is used to keep the number of move-out reversals to a minimum. The owner move-out must take place before the end of the validity period because an actual move-in must be announced several weeks in advance.
Example
- Validity period from 10/01 to 04/30.
- Offset for latest start date: 14 days
- Automatic owner move-in on 11/02.
Date 11/02 04/16 04/30
------|----------------------------|------------|-------------
Activity Move-in Start Move-out
The workffow starts on 03/16 and creates the automatic owner move-out on the move-out date 04/30.
History
Last changed by/on | SAP | 20050224 |
SAP Release Created in |