Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ MGA (Package) Application development R/3 material master from 3.0
Basic Data
Data Element | DZPLPR_BAPI |
Short Description | Future Planned Price |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BAPICURR | |
Data Type | DEC | Counter or amount field with comma and sign |
Length | 23 | |
Decimal Places | 4 | |
Output Length | 30 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | PLND_PRICE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plnd price |
Medium | 15 | Fut. plnd price |
Long | 20 | Future planned price |
Heading | 14 | Fut.plnd price |
Documentation
Definition
Price from a marked standard cost estimate.
Use
If you create and mark a standard cost estimate for the material, the results of this standard cost estimate are copied to this field.
Procedure
Examples
Dependencies
If this standard cost estimate for the material is subsequently released, the price entered here is updated as the current planned price and as the current standard price.
If the standard cost estimate is already marked, but not released, and you create a new standard cost estimate for the material, you can remark the results. You can keep remarking the results until you release the standard cost estimate.
Note
If no marked standard cost estimate exists, you can enter a price in this field manually. This enables the system to find a price when costing an assembly using the valuation strategy, even if no standard cost estimate with status KA (costed without errors) exists for a material (such as a raw material or semifinished product) in the bill of material (BOM).
If you subsequently create and mark a standard cost estimate for this material, the results of the standard cost estimate are adopted as the future planned price, and the manual entry overwritten. It can then no longer be changed. For maintaining the planned prices of material components, you are therefore recommended using the fields Planned price 1, Planned price 2, and Planned price 3, and defining them in the valuation strategy.
History
Last changed by/on | SAP | 19990301 |
SAP Release Created in |