SAP ABAP Data Element DZPLPR_BAPI (Future Planned Price)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       MGA (Package) Application development R/3 material master from 3.0
Basic Data
Data Element DZPLPR_BAPI
Short Description Future Planned Price  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type BAPICURR    
Data Type DEC   Counter or amount field with comma and sign 
Length 23    
Decimal Places 4    
Output Length 30    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name PLND_PRICE   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plnd price 
Medium 15 Fut. plnd price 
Long 20 Future planned price 
Heading 14 Fut.plnd price 
Documentation

Definition

Price from a marked standard cost estimate.

Use

If you create and mark a standard cost estimate for the material, the results of this standard cost estimate are copied to this field.

Procedure

Examples

Dependencies

If this standard cost estimate for the material is subsequently released, the price entered here is updated as the current planned price and as the current standard price.

If the standard cost estimate is already marked, but not released, and you create a new standard cost estimate for the material, you can remark the results. You can keep remarking the results until you release the standard cost estimate.

Note

If no marked standard cost estimate exists, you can enter a price in this field manually. This enables the system to find a price when costing an assembly using the valuation strategy, even if no standard cost estimate with status KA (costed without errors) exists for a material (such as a raw material or semifinished product) in the bill of material (BOM).

If you subsequently create and mark a standard cost estimate for this material, the results of the standard cost estimate are adopted as the future planned price, and the manual entry overwritten. It can then no longer be changed. For maintaining the planned prices of material components, you are therefore recommended using the fields Planned price 1, Planned price 2, and Planned price 3, and defining them in the valuation strategy.

History
Last changed by/on SAP  19990301 
SAP Release Created in