SAP ABAP Data Element DGUELAB (Date when the rent adjustment becomes valid)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
FVVI (Package) R/3 appl.dev. for Financial Assets Management: Real estate
⤷
⤷
⤷
Basic Data
| Data Element | DGUELAB |
| Short Description | Date when the rent adjustment becomes valid |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DATUM | |
| Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
| Length | 8 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | IDG | |
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Valid from |
| Medium | 15 | Valid from |
| Long | 20 | Valid from |
| Heading | 10 | Valid from |
Documentation
Definition
The date from which the conditions adjustment is to be carried out.
Dependencies
The date is usually identical to the adjustment date.
For index-based rent adjustments however, the adjustment date determines the number of points at which the adjustment takes place (4/1/92 in this field means that the adjustment takes place on the basis of the number of points in April 92).
The valid-from date is derived from the adjustment date and the adjustment delay in months for index-linked rent adjustments; that means
- if the adjustment date is 4/1/92 and the adjustment delay is 2 months
- then the valid-from date of the conditions is 6/1/92.
History
| Last changed by/on | SAP | 19990827 |
| SAP Release Created in |