SAP ABAP Data Element DAYS_BEFORE_CURRENT_DATE (Number of Days for Calculating Start Date of Time Frame)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PM (Application Component) Plant Maintenance
     EAMS_BCV (Package) Content for Business Context Viewer
Basic Data
Data Element DAYS_BEFORE_CURRENT_DATE
Short Description Number of Days for Calculating Start Date of Time Frame  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type INT4    
Data Type INT4   4-byte integer, integer number with sign 
Length 10    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Start 
Medium 20 Days for Start Date 
Long 40 No. of Days for Calculating Start Date 
Heading Start 
Documentation

Definition

Specifies the start date of the time frame in which the system searches for service orders and maintenance orders for technical objects.

Use

This field is empty by default. If you leave this field empty, the system searches for all service and maintenance orders that exist for a particular technical object (up to the date in the Days for End Date field). If you enter a value in this field, the system searches for orders whose reference date is on this date or later.

If you enter a number of days in this field, the system calculates the start date of the time frame in which it searches for orders as follows:

  • By entering a number without a plus or minus sign, you specify a time frame that begins in the past. The system subtracts this number from the current date, thus determining the start date of the time frame. If you enter zero, the system uses the current date for the start date.
  • By entering a negative number, you specify a time frame that starts in the future. If you enter a minus sign in front of the number of days, the system adds this number to the current date, thus determining the start date of the time frame.

In the Days for End Date field, you can specify the end date of the time frame in which the system searches for orders for technical objects. If you do not specify an end date, the system searches for all orders that were created starting on the specified start date.

Dependencies

Example

History
Last changed by/on SAP  20140121 
SAP Release Created in