SAP ABAP Data Element CY_PLATIMT (Type of entry planning period)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element | CY_PLATIMT |
Short Description | Type of entry planning period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CY_ZAPER | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Type |
Medium | 15 | Entry type |
Long | 20 | Date type |
Heading | 4 | Type |
Documentation
Definition
Specifies how you want to enter the limits of the planning period.
You can enter the planning period in two different ways:
- Entry with specific date
- Entry relative to current date
Example
Example of an entry with a concrete date:
Entry type Start Finish
CalMonth 3.1994 6.1994
CalDay 2.3.1994 31.11.94
Examples of an entry relatice to a current day, for example, to 14.1.1994:
Entry type Start Finish
CalDays -10 +20
This generates a planning period from 04.01.1994 to 03.02.1994.
Entry type Start Finish
CalWeeks -1 +2
This generates a planning period from 03.01.1994 to 30.01.1994.
History
Last changed by/on | SAP | 19950814 |
SAP Release Created in |