SAP ABAP Data Element CY_KAPTERM (Finite scheduling in the capacity availability check)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element | CY_KAPTERM |
Short Description | Finite scheduling in the capacity availability check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CY_KAPTERM | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Fin.sched. |
Medium | 15 | Finite sched. |
Long | 20 | Finite scheduling |
Heading | 0 |
Documentation
Definition
Specifies that the system executes finite scheduling for an order during the capacity availability check if there is not sufficient capacity available on the planned date for all operations in the order.
During finite scheduling, the system searches for dates on which you can execute the order without capacity problems.
Use
The indicator is only relevant for the capacity availability check in the background, that is, for the capacity availability check for:
- Collective conversion of planned orders to production orders
- Collective release of production orders
Dependencies
You control the capacity availability check and the finite scheduling with the help of the overall profile that you entered in Customizing for the availability check:
- In the time profile of the overall profile, you define the planning period in which the system searches during finite scheduling for dates with sufficient capacity.
- In the strategy profile of the overall profile, you define the planning direction in which the system searches for dates with sufficient capacity.
History
Last changed by/on | SAP | 19990526 |
SAP Release Created in |