Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element | CY_EIGBDIS |
Short Description | Date determination for dispatching of internal production |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CY_EIGBDIS | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | DispIntPro |
Medium | 20 | Dispatch Intern.Prod |
Long | 30 | Dispatch internal production |
Heading | 10 | DispIntPro |
Documentation
Definition
Specifies how the start date of the operations is calculated when automatically dispatching internal operations in networks and plant maintenance orders
The following possibilities exist:
- Dispatch at the earliest start date
- Dispatch at the latest start date
- Dispatch dependent on valid distributaion key for the scheduling capacity:
The distribution key contains a distribution strategy. In the distribution strategy the start date for distribution is specified (earliest or latest dates). This date specifies whether the earliest or latest start date is used.
The system determines the distribution key for the scheduling capacity as follows:
If the indicator "distribution from work center/operation" is set in theevaluation profile the distribution key from the operation is used. If no distribution key has been maintained in the system then the key from the capacity is used. In all other cases the system uses the standard distribution key in the evaluation profile
- Selection of dispatch date by the user:
In this case the system offers the user the earliest and latest dates tochoose from.
History
Last changed by/on | SAP | 19940827 |
SAP Release Created in |