SAP ABAP Data Element CY_CANCVER (Terminate dispatching when rescheduling with prod.versions)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CY01 (Package) R/3 Application Development: Resource Planning
Basic Data
Data Element | CY_CANCVER |
Short Description | Terminate dispatching when rescheduling with prod.versions |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KREUZ | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Terminatn |
Medium | 20 | Termination resched. |
Long | 30 | Term.resched with prod.version |
Heading | 10 | Terminatn |
Documentation
Definition
Use
If this indicator is set then rescheduling of a planned order from one line to another is terminated
- if the original line or the target line has not been specified as a production line in a production version for the material.
- if the original line or the target line in the routings for these production versions are assigned to more than one operation
If you have not set this indicator then dispatching is not terminated but carried out without taking the production version into account. That means that the planned order is scheduled with the old standard values and the formulas from the new work center and dispatched to the new line.
Dependencies
This indicator is relevant to rescheduling of planned orders taking the production version into account. It is only of significance if the indicator Rescheduling with production version is also set.
History
Last changed by/on | SAP | 19980706 |
SAP Release Created in |