Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | CS_ROMEN_V |
Short Description | Quantity of Variable-Size Item |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENGV13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 18 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | VSI_QTY | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Qty VSI |
Medium | 15 | Qty Var-Sz Item |
Long | 20 | Qty of Var-Size Item |
Heading | 17 | Qty Var-Size Item |
Documentation
Definition
Unit of variable-size item that calculates the system from the Size entered. You can also enter a Variable-Size Item Formula for the calculation.
The variable-size item quantity relates to one unit.
Procedure
If you change a field, which alters the calculation of the variable-size item quantity (such as size or formula), the system only makes a new calculation when you cancel the already available variable-size item quantity.
To do this, delete the contents of the field Variable-Size Item Quantity.
Examples
Size 1: 200
Size 2: 300
Variable-size unit of measure: MM
Variable-size item unit: SQUARE METERS
Calculation of Variable-Size Item Quantity:
A = Size 1 * Size 2
A = 200 MM * 300 MM
A = 0,06 QM
The variable-size item quantity amounts to per sheet 0,06 SQUARE METERS.
Dependencies
The system calculates the total quantity needed for the disposition. For a base quantity of 1 this is the number of variable size items multiplied by the variable-size item quantity.
If, for example, 10 sheets make up the components (number of variable size items = 10), the total quantity amounts to 10 * 0,06 QM = 0,6 QM.
Supplementary Documentation - CS_ROMEN_V0001
Use
The raw material quantity calculated is effective for material requirements planning.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 20020219 |
SAP Release Created in | 470 |