| Data Element | CS_ROMEN |
| Short Description | Quantity of variable-size item |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DEC10_3 | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 13 | |
| Decimal Places | 3 | |
| Output Length | 17 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Qty VSI |
| Medium | 15 | Qty Var-sz item |
| Long | 20 | Qty of var-size item |
| Heading | 17 | Qty var-size item |
Documentation
Definition
Quantity of variable-size items, that the system calculates from the entered sizes. If necessary, you can enter a variable-size item formula for the calculation.
The variable-size item quantity refers to one piece.
Procedure
If you change a field that affects the calculation of the quantity of the variable-size items (such as size, formula), the system only recalculates, the variable-size item quantity after you have revoked the already existing variable-size item quantity.
To do this, delete the content of the variable-size item quantity field.
Examples
Size 1: 200
Size 2: 300
Size unit of measure: MM
Variable size item unit of measure: QM
Calculating the variable size item:
A = Size 1 * Size 2
A = 200 MM * 300 MM
A = 0,06 QM
The variable size item quantity amounts to 0,06 QM per sheet.
Dependencies
The total quantity needed in the MRP is calculated by the system. For a base quantity of 1 the product is from number of variable size item and variable size item quantity.
If for example 10 sheet parts are entered in the component (number of variable size items = 10), then the total quantity is 10 * 0,06 QM = 0,6 QM.
Supplementary Documentation - CS_ROMEN_V0001
Use
The raw material quantity calculated is effective for material requirements planning.
Procedure
Examples
Dependencies
History