SAP ABAP Data Element CS_NLFZV (Lead-time offset for operation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material
⤷
⤷
Basic Data
| Data Element | CS_NLFZV |
| Short Description | Lead-time offset for operation |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | NLFZT | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 3 | |
| Decimal Places | 0 | |
| Output Length | 4 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | LEAD_TIME_OFFSET_OPR | |
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Oper. LTO |
| Medium | 15 | Oper. LT offset |
| Long | 20 | Oper. LT offset |
| Heading | 9 | Oper. LTO |
Documentation
Definition
Time that the component lead-time offset states with reference to the start date of the allocated operation.
(In the Project System read activity for operation.)
Use
The following areas evaluate the operation related lead-time offset:
- Plant maintenance orders
- Networks
- Production orders
- Process orders
Maintain the following times dependently of the +/- sign:
- Lead-time offset - positive value
Component can be available after the operation start date
- Lead time - negative value
Component must be available before the operation start date
Procedure
Examples
Operation start date 0010: 05.13.1998, 9 a.m.
Operation start date 0020: 05.14.1998, 2 p.m.
---------------------------------------------------------
Component Operation Lead-time offset (h) End date
M-01 0010 2+ 05.13.1998, 11 a.m.
M-02 0020 2- 05.14.1998, 12 a.m.
- The component M-01 does not have to be available until 2 hours after the start time of the allocated operation 0010.
- Because the component M-02 must be available 2 hours before the start time of the allocated operation, the end time is 12 a.m.
Dependencies
History
| Last changed by/on | SAP | 19991108 |
| SAP Release Created in |