SAP ABAP Data Element CS_KZDUM (Indicator: phantom assembly off)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element CS_KZDUM
Short Description Indicator: phantom assembly off  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Phant. off 
Medium 15 Phantom off 
Long 20 Phantom assembly 
Heading Phan.off 
Documentation

Definition

This indicator controls the explosion of a phantom assembly in BOM explosion functions.

Use

Explosion of phantom assembly in standard SAP system

If a special procurement key for a phantom assembly is entered in the material master (MRP 2 detail screen) of the header material of a phantom assembly:

  • Dependent requirements for the superior assembly are transferred directly to the components of the phantom assembly
  • Planned orders or purchase requisitions are generated for the components of the phantom assembly

In the following example, only the components (X) of the phantom assembly are read: the phantom assembly itself is ignored in the explosion path.

_____
I I
I_____I
I
I--------I--------------I
I------I--------I----I I
I _____ _____ I _____
I I X I I X I I I I
I I_____I I_____I I I_____I
I--------------------I

Explosion of phantom assembly with this indicator

  • If the explosion type determines that the standard explosion for a phantom assembly is switched off, dependent requirements are generated for the header materials of phantom assemblies, as well as the components.

In the following example, both the header material of the phantom

assembly (P) and the components (X) are read.

_____
I I
I_____I
I
I----------------------I
I----------I---------I I
I _____ I _____
I I P I I I I
I I_____I I I_____I
I I I
I I--------I I
I _____ _____ I
I I X I I X I I
I I_____I I_____I I
I--------------------I

Key

  • Phantom assembly:
    _____
    I P I
    I_____I

  • Component of a phantom assembly:
    _____
    I X I
    I_____I
History
Last changed by/on SAP  19950401 
SAP Release Created in