Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | CS_HISNA |
Short Description | Indicator: History requirement new variant / alternative |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CS_HISNA | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | HiReqVar |
Medium | 15 | HistReq.Variant |
Long | 20 | Hist. reqmt. variant |
Heading | 5 | HReqV |
Documentation
Definition
Indicator specifying that a history is required when a bill of material of a BOM group is created.
If you enter a value for history requirement, each new alternative or variant must be created with reference to a change number.
Procedure
History requirement for the following values:
- Blank
History required if at least one alternative or variant has been created or changed with reference to an order number
- Value 1
History required if a BOM status with history requirement has been specified for at least one alternative or variant
(See IMG activity Configure history requirement)This does not require that a BOM of the BOM group has been processed with reference to a change number.
No history requirement
- Value 2
Irrespective of existing alternatives or variants, you can always create new BOMs without reference to a change number.
Examples
Dependencies
The setting is irrelevant if the History reqmt indicator has been set.
History
Last changed by/on | SAP | 19970708 |
SAP Release Created in |