Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element | CS_E_XSTAN |
Short Description | BOM Usage (Next Level) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | STLAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table | T416 |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | CSV | |
Default Component name | BOM_USAGE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BOM Usg NL |
Medium | 15 | BOM Usage NL |
Long | 20 | BOM Usage (Next Lvl) |
Heading | 7 | BOM Usg |
Documentation
Definition
Key that defines the areas (for example, production) where the bill of material can be used.
Use
By selecting different indicators, you specify the maximum value of the item status and control whether the item must/can be processed in the specific area (for example, production), or whether processing is allowed at all.
Procedure
Examples
You can maintain separate BOMs containing different items for a material in the company areas Production and Pricing:
- Production bill of material:
The BOM creates items that are relevant for production. These items are copied into the planned order. The dependent requirement is determined and is also copied to the production order during conversion. Production is triggered using the production order with the production of the material.
- Pricing bill of material:
The BOM creates items that are relevant for determining material input costs for a product.
If, for example, you create a pricing with a quantity structure, the BOM and all items relevant for determining the production costs are determined automatically.
History
Last changed by/on | SAP | 20010607 |
SAP Release Created in | 46C |