SAP ABAP Data Element CS_E_VWEGX (Path (Predecessor))
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element CS_E_VWEGX
Short Description Path (Predecessor)  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC4    
Data Type DEC   Counter or amount field with comma and sign 
Length 4    
Decimal Places 0    
Output Length 5    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Path(Pred) 
Medium 15 Path(Predecess) 
Long 20 Path (Predecessor) 
Heading PPh 
Documentation

Definition

Direction for exploding a component.
Using the route of predecessor and component, you can reconstruct the exact structure of a bill of material.

The level and/or the route are only relevant for planning using dummy assemblies.
Level and route show you the exact position of a dummy assembly within a bill of material.

Example

A BOM contains the following dummy assemblies (DummyAs) and materials:

Material A
_________________________|__________________
| | |
| | |
DummyAs B DummyAs C Material D
_____|________ _____|______
| | | |
| | | |
DummyAs E Mat. F Mat. G Mat. H
|
|
Mat. J

In order to track the position of the assemblies within the BOM structure, the levels and routes are assigned according to the following logic:

  • A level number is assigned for each BOM level
  • A route number is assigned for each BOM path

In the following BOM, the first number refers to the level, the second number the route. If the material is not a dummy assembly, the number '0' is assigned as level and/or route. If the material is a component of a dummy assembly however, then the component inherits the level and route from the dummy assembly.

Material A
(0/0)
_________________________|__________________
| | |
| | |
DummyAs B DummyAs C Material D
(1/1) (1/2) (0/0)
_____|________ _____|______
| | | |
| | | |
DummyAs E Mat. F Mat. G Mat. H
(2/1) (1/1) (1/2) (1/2)
|
|
Mat. J
(2/1)

History
Last changed by/on SAP  20010607 
SAP Release Created in 46C