SAP ABAP Data Element CS_ALPST (Alternative Item: Strategy)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Basic Data
Data Element CS_ALPST
Short Description Alternative Item: Strategy  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CS_ALPST    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name ALT_STRAT   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Strategy 
Medium 15 Strategy 
Long 20 Strategy 
Heading Str 
Documentation

Definition

This value defines how items in an alternative group are selected for withdrawal postings.
This strategy is ignored in material requirements planning (MRP).

Use

The withdrawal posting for the reservation in the production order can be selected as follows:

  • According to usage probability (manual changes possible)

    For all items that you want to reserve, enter:

    • Strategy (value 1 or no entry)
    • Priority (only influences how materials are sorted)
    • Usage probability
  • Withdrawal if 100% availability

    For all items that you want to reserve, enter:

    • Strategy (value 2)
    • Priority
    • If you do not enter a priority, the system checks the items in the sequence in which they are transferred to the availability check.
    • Usage probability

Procedure

Enter the same strategy for all alternative items in an alternative item group.

Example

Withdrawal if 100% availability (strategy 2)

This strategy uses ATP logic to check availability in the defined ranking order.

Gross requirements: 100 pieces

M    UP (%)    RO    RQ    ATP qty    Issue qty

A    20    1    20    30        0

B    30    2    30    150    100

C    50    3    50    180    0

Key

M    Material

UP    Usage probability

RO    Ranking order

RQ    Requirements quantity

The first material in the ranking order that is supplied 100% on the requirement date is reserved in the required quantity (material B).

If a partial withdrawal is carried out in a production order, when additional partial withdrawals take place, no further checks are carried out for this production order. Additional partial withdrawals result from the alternative item, from which the first withdrawal took place.

If when using strategy 2 none of the alternative items cover the requirements 100%, the availability check for all items will confirm the available. A reservation only occurs for the available quantity.

History
Last changed by/on SAP  19991102 
SAP Release Created in