Hierarchy
⤷ SCM-BAS (Application Component) SCM Basis
⤷ CIF4 (Package) 3Core Interface for APO - Modules for Releases from 4.0B
Basic Data
Data Element | CRES_MDR_NAME |
Short Description | Defintion Name for the Product-Dependent Rate |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR40 | |
Data Type | CHAR | Character String |
Length | 40 | |
Decimal Places | 0 | |
Output Length | 40 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prod. Rate |
Medium | 15 | Prod-Dep. Rate |
Long | 21 | Product-Depend. Rate |
Heading | 15 | Prod-Dep. Rate |
Documentation
Definition
Explicitly identifies a model for the product-dependent rates in SAP APO. You can enter the product-dependent rates for several products within a model.
Use
You enter product-dependent rates for the products that you do not want to produce in the base rate or in the production rate. Due to the fact that the base rate is independent of time, you enter the product-dependent rate as a factor in relation to the base rate. You can, for example, enter the factor 0.8 for a product. By doing so, you specify that for this product you can only produce 80% of the amount in the same time compared to other products. The system saves the factor for this product. If you schedule using the production rate, the system multiplies the production rate with the product-dependent factor for the affected product.
Before defining the product-dependent rates, you can enter a resource in the production line resource field. The system gives the base rate of the production line resource as a default. You can overwrite this default and the system then calculates the factor automatically.
Dependencies
After you have defined the model for the product-dependent rates, you can allocate it to the production line resource in the header data on the tab page standard capacity
History
Last changed by/on | SAP | 20030602 |
SAP Release Created in |