SAP ABAP Data Element CRES_GEN_LC_FORWARD (Validity of Available Resource Capacity (In the Future))
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ SCM-BAS (Application Component) SCM Basis
⤷ CIF4 (Package) 3Core Interface for APO - Modules for Releases from 4.0B
⤷ SCM-BAS (Application Component) SCM Basis
⤷ CIF4 (Package) 3Core Interface for APO - Modules for Releases from 4.0B
Basic Data
Data Element | CRES_GEN_LC_FORWARD |
Short Description | Validity of Available Resource Capacity (In the Future) |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUMC4 | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Days + |
Medium | 15 | Days + |
Long | 20 | Days + |
Heading | 6 | Days + |
Documentation
Definition
Defines the end of the validity period of the available capacity of the resource in SAP APO.
Use
Starting from the day on which the resource was created (or the planning-relevant data for the resource was changed and saved), the system counts the specified number of days into the future.
You should define the time period relevant for scheduling a resource to only be as long as the planning considerations require. By doing so, you avoid using too much memory in SAP liveCache.
Notes
To update the validity period of a resource without saving the resource again, you can use the report /SAPAPO/CRES_CAPACITY_LENGTHEN. We recommend that you schedule the report periodically.
History
Last changed by/on | SAP | 20030602 |
SAP Release Created in |