SAP ABAP Data Element CRES_CAMPAIGN_SNP (Cross-Period Lot Sizes)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   SCM-BAS (Application Component) SCM Basis
     CIF4 (Package) 3Core Interface for APO - Modules for Releases from 4.0B
Basic Data
Data Element CRES_CAMPAIGN_SNP
Short Description Cross-Period Lot Sizes  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CRES_CAMPAIGN_SNP    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PerLotSize 
Medium 15 Crs-Per. Lot Sz 
Long 20 Cross-Period Lot Sz 
Heading Per.Lot. 
Documentation

Use

If you activate this indicator and choose Cross-Period Lot Size, the optimizer in Supply Network Planning (SNP) in SAP Supply Chain Planning (SAP SCM) can perform cross-period lot size planning for this resource. During this planning, the SNP optimizer takes into account the setup statuses from the previous period, if the same production process model (PPM) or production data structure (PDS) is used to produce a product within this period. This means that the optimizer only schedules one setup operation. The system then calculates the setup costs and setup consumptions (fixed resource and material consumptions) that were defined in the PPM/PDS for a resource for which the Period Lot Size indicator has been set.

If you activate this indicator and choose Sequence-Dependent Lot Size, the SNP optimizer can perform sequence-dependent lot size planning for this resource. This means that the optimizer takes into account setup costs and setup times that you have defined in the setup matrix.

Dependencies

Cross-Period Lot Size:

  • You must activate cross-period lot size planning in the SNP optimizer profile in SAP SCM, in other words, you must specify a period in the Cross-Period Lot Size field, across which the optimizer is to take into account the setup statuses from the previous period, if the same PPM is being used to produce a product within this period.
  • The PPM/PDS that is taken into account by the SNP optimizer during planning in SAP SCM must use this resource.
  • The PPM/PDS is permitted to use a maximum of one resource for which the Period Lot Size indicator has been set.
  • The PPM/PDS is not permitted to use any other resources with fixed resource consumption.
  • The PPM/PDS duration must be less than or equal to the smallest bucket from the planning buckets profile being used.

Sequence-Dependent Lot Size:

  • You must activate sequence-dependent lot size planning in the SNP optimizer profile in SAP SCM, in other words, you must specify a period in the Sequence-Dependent Lot Size field, across which the optimizer is to take into account sequence-dependent lot sizes.
  • The PDS that is taken into account by the SNP optimizer during planning in SAP SCM must use this resource and must contain a setup group. Only PDS are supported for this function. PDS that were created using iPPE are not supported.
  • The PDS is permitted to use a maximum of one resource for which the Period Lot Size indicator has been set.