SAP ABAP Data Element CR_ZRAST (Period pattern key for available capacity)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CR (Package) R/3 Application development: PP Resources
⤷
⤷
⤷
Basic Data
| Data Element | CR_ZRAST |
| Short Description | Period pattern key for available capacity |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CR_ZRASTID | |
| Data Type | CHAR | Character String |
| Length | 10 | |
| Decimal Places | 0 | |
| Output Length | 10 | |
| Value Table | TC35 |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | PerPattern |
| Medium | 15 | Period pattern |
| Long | 20 | Period pattern key |
| Heading | 10 | PerPattern |
Documentation
Definition
With this key you can define any number of chronological time segments. Each of these time segments can have a specific period length.
Use
A period pattern is used to:
- determine the increment and the time frame to be used when cumulating available capacity via a hierarchy or over time.
- establish the time period for a graphical display.
Examples
For example, a period pattern consisting of a time segment with 7 periods each composed of one day is used by the system to cumulate available capacity for each individual day in the period.
If there is a second time segment in the period pattern and if this segment consists of 3 periods each one week in length, then the system cumulates available capacity for 3 chronological weeks.
History
| Last changed by/on | SAP | 19931130 |
| SAP Release Created in |