SAP ABAP Data Element CPET_PRCFIX_EARLIESTPRELIM_IND (CPE Provisional Earliest Exercise Date)
Hierarchy
☛
PI_BASIS (Software Component) Basis Plug-In
⤷ CA-GTF-CPE (Application Component) Commodity Pricing Engine
⤷ CPE_BASIS (Package) Commodity Pricing Engine: Basic Objects
⤷ CA-GTF-CPE (Application Component) Commodity Pricing Engine
⤷ CPE_BASIS (Package) Commodity Pricing Engine: Basic Objects
Basic Data
Data Element | CPET_PRCFIX_EARLIESTPRELIM_IND |
Short Description | CPE Provisional Earliest Exercise Date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | BOOLEAN | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Prov. |
Medium | 20 | Provisional Earliest |
Long | 40 | Provisional Earliest Exercise Date |
Heading | 55 | Provisional Earliest Exercise Date |
Documentation
Definition
Indicates that the earliest exercise date has not been calculated as final and that the system displays the pricing date as a provisional value.
Use
For exercise date routine 3 = Reference Date, you must enter a reference date. You do this by choosing the respective Reference Date and Time Routine, for example the Item Goods Issue Date routine.
If the system does not find a reference date for the exercise date routine during formula evaluation, meaning it cannot assign it to determine the earliest exercise date, the system assigns the pricing date instead. The system selects the Provisional checkbox for this exercise date routine.
Dependencies
This information is relevant for exercise date routine 3 = Reference Date only.
Example
History
Last changed by/on | SAP | 20131122 |
SAP Release Created in |