SAP ABAP Data Element CPET_EXCL_BASEDATE (CPE Term - Exclude Base Date)
Hierarchy
PI_BASIS (Software Component) Basis Plug-In
   CA-GTF-CPE (Application Component) Commodity Pricing Engine
     CPE_BASIS (Package) Commodity Pricing Engine: Basic Objects
Basic Data
Data Element CPET_EXCL_BASEDATE
Short Description CPE Term - Exclude Base Date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CHAR1_X    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Excl. Base 
Medium 20 Exclude Base Date 
Long 40 Exclude Base Date 
Heading ExB 
Documentation

Definition

Defines whether or not the base date timestamp should be excluded from the list of timestamps for which the commodity pricing engine (CPE) reads quotation or currency data.

Use

You can set the exclude base date flag in the period determination rule. The period determination routine 1 takes this flag into account.

Dependencies

Example

If the period is defined as the next five days after the base date, the time units before will be 0, the time units after will be 5, and you should set the exclude base date flag.

History
Last changed by/on SAP  20130604 
SAP Release Created in 2004_1_46C