SAP ABAP Data Element CP_RUDR (Indicator: Print confirmation for operation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CP (Package) R/3 Application development: PP Task Lists

⤷

⤷

⤷

Basic Data
Data Element | CP_RUDR |
Short Description | Indicator: Print confirmation for operation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | FLAG | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Print conf |
Medium | 15 | Print confirm. |
Long | 20 | Print confirmation |
Heading | 10 | Print conf |
Documentation
Definition
This indicator specifies that confirmation slips are printed for the following objects if specified in the control key you selected:
- operations and sub-operations in Quality Management (QM), Plant Maintenance (PM) and Production Planning (PP)
- activities and activity elements in the Project System (PS)
- phases and secondary resources in Production Planning for Process Industries (PP-PI)
Operations in PP-PI cannot be confirmed. The system ignores this indicator for them.
Dependencies
This setting is only taken into account if, in Customizing for print control (section List control for transaction),
- printing of confirmation slips is permitted for the corresponding order type, plant and MRP controller (QM, PS, PP and PP-PI) or for order type, planning plant and planner group (PM)
- control key check when confirmation slips are printed is active
To print confirmation slips, you must also
- set the Print indicator in the control key
- set a number greater than "0" for confirmation slips to be printed in the order (see General Data for the respective operation, sub-operation, phase or secondary resource).
Note
In PP and PP-PI, you can specify in the production control profile that shop floor papers are automatically printed when the order is released.
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in |