SAP ABAP Data Element CP_RUDR (Indicator: Print confirmation for operation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CP (Package) R/3 Application development: PP Task Lists
Basic Data
Data Element CP_RUDR
Short Description Indicator: Print confirmation for operation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type FLAG    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Print conf 
Medium 15 Print confirm. 
Long 20 Print confirmation 
Heading 10 Print conf 
Documentation

Definition

This indicator specifies that confirmation slips are printed for the following objects if specified in the control key you selected:

  • operations and sub-operations in Quality Management (QM), Plant Maintenance (PM) and Production Planning (PP)

  • activities and activity elements in the Project System (PS)

  • phases and secondary resources in Production Planning for Process Industries (PP-PI)

    Operations in PP-PI cannot be confirmed. The system ignores this indicator for them.

Dependencies

This setting is only taken into account if, in Customizing for print control (section List control for transaction),

  • printing of confirmation slips is permitted for the corresponding order type, plant and MRP controller (QM, PS, PP and PP-PI) or for order type, planning plant and planner group (PM)
  • control key check when confirmation slips are printed is active

To print confirmation slips, you must also

  • set the Print indicator in the control key
  • set a number greater than "0" for confirmation slips to be printed in the order (see General Data for the respective operation, sub-operation, phase or secondary resource).

Note

In PP and PP-PI, you can specify in the production control profile that shop floor papers are automatically printed when the order is released.

History
Last changed by/on SAP  20130604 
SAP Release Created in