Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ KPLA (Package) Cost Accounting, planning RK-S
Basic Data
Data Element | CORR_PER |
Short Description | Execute period adjustment |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | PerAdj |
Medium | 15 | Period adjust. |
Long | 27 | Execute period adjustment |
Heading | 6 | PerAdj |
Documentation
Definition
Indicator controlling whether plan activity quantities from simulated plan or SOP orders outside of the adoption timeframe are adopted as scheduled activities in the Cost Center Accounting component (CO-OM-CCA).
- If the indicator is not set, the system does not accept the data as scheduled activity.
- If the indicator is set, the system accepts all plan activity quantities from simulated plan or SOP orders from the selected planning scenario or rough planning version as scheduled activity. Deadlines outside of the adoption timeframe are adjusted so that all scheduled activity quantities lie within the timeframe.
Example
In integrated planning for the following fiscal year, the plan scenario in long-term planning includes a primary planning requirement for a finished product in the first period of the fiscal year. The necessary unfinished products are secondary requirements either wholly or partially in the last period of the current fiscal year.
The scheduling of routings for primary and secondary requirements results in given network activities appearing either wholly or partially in the current fiscal year.
If the indicator is set, the current fiscal year adopts all activity quantities associated with the routing. If the indicator is not set, network activities wholly or partially absent from the current fiscal year have corresponding activity quantities wholly or partially absent as well.
History
Last changed by/on | SAP | 19971012 |
SAP Release Created in |