SAP ABAP Data Element CORR_PER (Execute period adjustment)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       KPLA (Package) Cost Accounting, planning RK-S
Basic Data
Data Element CORR_PER
Short Description Execute period adjustment  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PerAdj 
Medium 15 Period adjust. 
Long 27 Execute period adjustment 
Heading PerAdj 
Documentation

Definition

Indicator controlling whether plan activity quantities from simulated plan or SOP orders outside of the adoption timeframe are adopted as scheduled activities in the Cost Center Accounting component (CO-OM-CCA).

  • If the indicator is not set, the system does not accept the data as scheduled activity.
  • If the indicator is set, the system accepts all plan activity quantities from simulated plan or SOP orders from the selected planning scenario or rough planning version as scheduled activity. Deadlines outside of the adoption timeframe are adjusted so that all scheduled activity quantities lie within the timeframe.

Example

In integrated planning for the following fiscal year, the plan scenario in long-term planning includes a primary planning requirement for a finished product in the first period of the fiscal year. The necessary unfinished products are secondary requirements either wholly or partially in the last period of the current fiscal year.

The scheduling of routings for primary and secondary requirements results in given network activities appearing either wholly or partially in the current fiscal year.

If the indicator is set, the current fiscal year adopts all activity quantities associated with the routing. If the indicator is not set, network activities wholly or partially absent from the current fiscal year have corresponding activity quantities wholly or partially absent as well.

History
Last changed by/on SAP  19971012 
SAP Release Created in