SAP ABAP Data Element CO_ACOMP (All components on goods movements overview)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CORU (Package) R/3 Application development: PP Confirmations
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CORU (Package) R/3 Application development: PP Confirmations
Basic Data
Data Element | CO_ACOMP |
Short Description | All components on goods movements overview |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | XFELD | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | All comps |
Medium | 15 | All comps |
Long | 20 | All components |
Heading | 3 | All |
Documentation
Definition
Specifies that in the goods movements overview, all components are to be displayed that are assigned to the operation in question. The system posts the withdrawal of all components displayed in the overview as a backflush.
Use
You use this indicator to decide which components are displayed in the overview for individual time confirmation:
- If you set the indicator, the system displays all the components regardless of whether or not the backflushing indicator is set for the component in the order.
- If you do not set the indicator, the system only displays the components for which the backflushing indicator is set.
In addition, the material produced appears in the goods movements overview if it is to be placed into stock using an automatic goods receipt. You specify whether or not an automatic goods receipt is to take place in Customizing for the operation control key or in the production scheduling profile.
Dependencies
The indicator has no influence on the overall completion confirmation.
Example
History
Last changed by/on | SAP | 19981130 |
SAP Release Created in |