SAP ABAP Data Element CN_PCOST (Calculation of planned costs)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
⤷ PS-ST-OPR-NET (Application Component) Network and Activity
⤷ CN_NET_OPR (Package) Operative Network
Basic Data
Data Element | CN_PCOST |
Short Description | Calculation of planned costs |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CN_PCOST | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Plan costs |
Medium | 15 | Plan cost calc. |
Long | 20 | Planned cost calcul. |
Heading | 4 | PlCo |
Documentation
Definition
Specifies whether the plan costs are calculated or updated when you save the network.
Use
Here you can decide, whether the plan costs are updated / calculated never, always or only if the network has Released status.
If you choose update plan costs, only those objects that have changed are costed again.
Dependencies
Even if you specify that the plan costs are never determined or updated, you can always start this function in the network.
History
Last changed by/on | SAP | 19990310 |
SAP Release Created in |