SAP ABAP Data Element CKML_FLG_NEG_FALLBACK (Alternative Price Strategy (Negative Price))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CKML (Package) Material ledger
⤷
⤷
⤷
Basic Data
| Data Element | CKML_FLG_NEG_FALLBACK |
| Short Description | Alternative Price Strategy (Negative Price) |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | BOOLE | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Alt.Price |
| Medium | 20 | Alternative Price |
| Long | 40 | Costing with Alternative Price |
| Heading | 5 | AltPr |
Documentation
Definition
By setting this indicator, you specify that the system uses an an alternative price during multilevel material price determination if a negative price was calculated.
If you do not set the indicator, the material is not costed. Pay attention to the messages.
For more information choose SAP Library -> Accounting -> Controlling -> Product Cost Controlling -> Actual Costing/Material Ledger -> Multilevel Actual Costing -> Costing Run: Multilevel Actual Costing -> Process Flow: Multilevel Actual Costing -> Performing Multilevel Material Price Determination -> Error During Multilevel Material Price Determination -> Error Correction by the System, and read the section Costing with an Alternative Price.
History
| Last changed by/on | SAP | 20000104 |
| SAP Release Created in | 46C |