SAP ABAP Data Element CK_X_DATUM (Selection Criterion for Cost Estimates Based on Dates)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CK (Package) R/3 Application development: PP Product Costing

⤷

⤷

⤷

Basic Data
Data Element | CK_X_DATUM |
Short Description | Selection Criterion for Cost Estimates Based on Dates |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_X_DATUM | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | KDS | |
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Criterion |
Medium | 15 | Date Interval |
Long | 35 | Date Interval Criterion |
Heading | 40 | Date Interval Criterion |
Documentation
Definition
You use this indicator to control how cost estimates are selected with reference to specific costing dates.
Use
On the basis of the specified dates, cost estimates are selected according to criteria such as the following:
- Validity area for costing: select overlaps
All cost estimates are selected whose validity areas fall between the specified dates at all (defined by "Costing date from" and "Costing date to").
- Validity area for costing: complete
All the cost estimates are selected whose validity areas are contained within the specified dates (defined via 'Costing date from' and "Costing date to").
- "Costing date from" within the specified dates
All cost estimates are selected that have a "Costing date from" within the specified dates.
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |