SAP ABAP Data Element CK_X_DATUM (Selection Criterion for Cost Estimates Based on Dates)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element CK_X_DATUM
Short Description Selection Criterion for Cost Estimates Based on Dates  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CK_X_DATUM    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID KDS  
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Criterion 
Medium 15 Date Interval 
Long 35 Date Interval Criterion 
Heading 40 Date Interval Criterion 
Documentation

Definition

You use this indicator to control how cost estimates are selected with reference to specific costing dates.

Use

On the basis of the specified dates, cost estimates are selected according to criteria such as the following:

  • Validity area for costing: select overlaps

    All cost estimates are selected whose validity areas fall between the specified dates at all (defined by "Costing date from" and "Costing date to").

  • Validity area for costing: complete

    All the cost estimates are selected whose validity areas are contained within the specified dates (defined via 'Costing date from' and "Costing date to").

  • "Costing date from" within the specified dates

    All cost estimates are selected that have a "Costing date from" within the specified dates.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  19970812 
SAP Release Created in