SAP ABAP Data Element CK_WAELZ (Indicator for Rollup Cost Component)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CK (Package) R/3 Application development: PP Product Costing
⤷
⤷
⤷
Basic Data
| Data Element | CK_WAELZ |
| Short Description | Indicator for Rollup Cost Component |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Roll Up |
| Medium | 15 | Roll Up CComp. |
| Long | 20 | Roll Up Cost Comp. |
| Heading | 1 | R |
Documentation
Definition
This indicator determines whether the costing results of a cost component are rolled up into the next-highest costing level (cost rollup).
Use
You can specify which cost components are rolled up into the next-highest costing level according to the criteria specific to your organization.
Example
If the sales and administration costs and the cost of goods manufactured are to be costed simultaneously in a costing level, you can proceed as follows:
- You set this indicator for the cost components identified as the cost of goods manufactured. These costs are rolled up into the next-highest costing level.
- You do not set this indicator for the cost components identified as sales and administration costs. These costs remain on the costing level on which they were originally calculated.
History
| Last changed by/on | SAP | 19980414 |
| SAP Release Created in |