SAP ABAP Data Element CK_VPLPX (Fixed Portion of Previous Planned Price)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element CK_VPLPX
Short Description Fixed Portion of Previous Planned Price  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERT11V    
Data Type CURR   Currency field, stored as DEC 
Length 11    
Decimal Places 2    
Output Length 15    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 PrPlanPrFx 
Medium 20 Prev. PlPrice, Fixed 
Long 26 Previous Plan Price, Fixed 
Heading 18 Prev. PlPrice, Fxd 
Documentation

Definition

Price from a released standard cost estimate.

Use

The price from a released standard cost estimate is updated in the current planned price field, as well as in the current standard price field.

The price in the current planned price remains constant until the standard cost estimate is released in the next period. The current planned price records the valuation of the material in the itemization of the standard cost estimate for the higher level material, for the respective period.

In the event of a manual price change to the standard price in the period, all materials are revaluated at the new standard price. The price in the current planned price field is not affected by the manual price change; the price in the current standard price field, however, is changed.

When the standard cost estimate is released for the next period, both fields are updated with the new price from the standard cost estimate.

With material costing, you can define a strategy for material valuation that accesses the value in the current planned price field.

Goods movements are valuated with the price in the current standard price field.

Procedure

Examples

Dependencies

History
Last changed by/on SAP  20010607 
SAP Release Created in