Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CK (Package) R/3 Application development: PP Product Costing
Basic Data
Data Element | CK_TEXPLOSION |
Short Description | Structure Explosion |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | StrctExpln |
Medium | 14 | Struct. Explos |
Long | 16 | Struct. Explosn |
Heading | 0 |
Documentation
Definition
BOM Explosion for the Costing Run
Use
In this step, you explode the BOMs for the materials that you selected in the selection step.
- First, you define the selection criteria (Change parameters).
- Then you explode the structure (Execute).
The Status column indicates whether the processing step was executed successfully or whether warning/error messages were issued.
You can display the log for this step by choosing Display log.
The Edited and With errors columns display the number of materials that have been edited and costed with errors respectively.
The Still open column shows the number of materials that have yet to be processed for the steps Structure explosion, Costing, Marking, and Release/ Price update.
Note
You can change the selection criteria retrospectively and execute the processing step afresh. In the case of standard cost estimates, this only applies if you have not yet released the costing run. After you have done so, you can execute the selection, explosion and costing steps again, although you cannot save the costing results.
Note
A BOM explosion is only then necessary if the materials selection is incomplete, such as finished goods or certain material types only.
You can skip the BOM explosion if, for example, you select
- all the materials in the plant without stock transfers from other plants
- all the materials in all the plants
History
Last changed by/on | SAP | 19990125 |
SAP Release Created in |