SAP ABAP Data Element CK_STEAS (Target start date of the operation)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CK (Package) R/3 Application development: PP Product Costing

⤷

⤷

⤷

Basic Data
Data Element | CK_STEAS |
Short Description | Target start date of the operation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CK_DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TgtStDtOp. |
Medium | 15 | TgtStDate of Op |
Long | 20 | TgtStart date of op. |
Heading | 9 | TgtStDtOp |
Documentation
Definition
In Easy Cost Planning this date is the valuation date of the costing item. The system sets this to the valuation date of the cost estimate. However it is also possible for you to overwrite this date. If you do this note that the date cannot fall before the valuation date.
Dependencies
Together with the date under latest end date you can also define a period for the item, which likewise must fall within the validity of the cost estimate.
Example
History
Last changed by/on | SAP | 19970812 |
SAP Release Created in |