SAP ABAP Data Element CK_MODIF (Type of BOM item)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM (Application Component) Customer Relationship Management
⤷
CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷
CKML (Package) Material ledger
⤷
⤷
⤷
Basic Data
| Data Element | CK_MODIF |
| Short Description | Type of BOM item |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | CK_MODIF | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | BOM |
| Medium | 15 | BOM item type |
| Long | 20 | Type of BOM item |
| Heading | 11 | BOM item ty |
Documentation
Definition
The input quantities were adjusted for multi-level price determination. This can happen in the following cases:
- If the material is in a cycle, the system ignores all input materials whose prices must be determined simultaneously with multi-level price determination in the same cycle.
- If you perform multi-level price determination with the indicator Reduced actual BOM set, the input materials are reduced for all procurement alternatives with errors.
The following reductions to input quantities are possible:
- Minimum from target quantities and actual quantities
You perform the costing run, marking the indicator Reduced actual BOM and it is possible to create a target BOM for a procurement alternative with errors. The minimum target and actual consumption is then used in multi-level price determination.
- Quantity is not taken into account
This can happen in the following situations:
- The input material is in the same cycle as the material to be costed. In this case, the input material is ignored by the system.
- You perform the costing run, with the indicator Reduced actual BOM set, and no target BOM can be calculated for a procurement alternative with errors. In this case, all input materials for this procurement alternative are ignored by the system.
History
| Last changed by/on | SAP | 19981110 |
| SAP Release Created in |