SAP ABAP Data Element CK_MODIF (Type of BOM item)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CKML (Package) Material ledger
Basic Data
Data Element CK_MODIF
Short Description Type of BOM item  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type CK_MODIF    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 BOM 
Medium 15 BOM item type 
Long 20 Type of BOM item 
Heading 11 BOM item ty 
Documentation

Definition

The input quantities were adjusted for multi-level price determination. This can happen in the following cases:

  • If the material is in a cycle, the system ignores all input materials whose prices must be determined simultaneously with multi-level price determination in the same cycle.
  • If you perform multi-level price determination with the indicator Reduced actual BOM set, the input materials are reduced for all procurement alternatives with errors.

The following reductions to input quantities are possible:

  1. Minimum from target quantities and actual quantities

You perform the costing run, marking the indicator Reduced actual BOM and it is possible to create a target BOM for a procurement alternative with errors. The minimum target and actual consumption is then used in multi-level price determination.

  1. Quantity is not taken into account

This can happen in the following situations:

  1. The input material is in the same cycle as the material to be costed. In this case, the input material is ignored by the system.
  2. You perform the costing run, with the indicator Reduced actual BOM set, and no target BOM can be calculated for a procurement alternative with errors. In this case, all input materials for this procurement alternative are ignored by the system.
History
Last changed by/on SAP  19981110 
SAP Release Created in